Articles liés à Resource-Constrained Project Scheduling: Models, Algorithms,...

Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications - Couverture rigide

 
9781848210349: Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Synopsis

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.

À propos de l?auteur

Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.

Acheter D'occasion

état :  Comme neuf
Unread book in perfect condition...
Afficher cet article
EUR 164,43

Autre devise

EUR 17,16 expédition depuis Etats-Unis vers France

Destinations, frais et délais

Acheter neuf

Afficher cet article
EUR 41,80

Autre devise

EUR 10,43 expédition depuis Royaume-Uni vers France

Destinations, frais et délais

Autres éditions populaires du même titre

9781905209729: Resources-constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Edition présentée

ISBN 10 :  190520972X ISBN 13 :  9781905209729
Editeur : ISTE Ltd, 2008
Couverture rigide

Résultats de recherche pour Resource-Constrained Project Scheduling: Models, Algorithms,...

Image d'archives

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Edité par Wiley-Blackwell, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : New Book Sale, London, Royaume-Uni

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Hardcover. Etat : New. Usually Dispatched within 1-2 Business Days , Buy with confidence , excellent customer service. N° de réf. du vendeur 1848210345--A29

Contacter le vendeur

Acheter neuf

EUR 41,80
Autre devise
Frais de port : EUR 10,43
De Royaume-Uni vers France
Destinations, frais et délais

Quantité disponible : 1 disponible(s)

Ajouter au panier

Image fournie par le vendeur

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Edité par Wiley-ISTE, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : GreatBookPrices, Columbia, MD, Etats-Unis

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. N° de réf. du vendeur 5510716-n

Contacter le vendeur

Acheter neuf

EUR 142,77
Autre devise
Frais de port : EUR 17,16
De Etats-Unis vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image fournie par le vendeur

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Edité par Wiley-ISTE, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Ancien ou d'occasion Couverture rigide

Vendeur : GreatBookPrices, Columbia, MD, Etats-Unis

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : As New. Unread book in perfect condition. N° de réf. du vendeur 5510716

Contacter le vendeur

Acheter D'occasion

EUR 164,43
Autre devise
Frais de port : EUR 17,16
De Etats-Unis vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image fournie par le vendeur

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Edité par Wiley-ISTE, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Ancien ou d'occasion Couverture rigide

Vendeur : GreatBookPricesUK, Woodford Green, Royaume-Uni

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : As New. Unread book in perfect condition. N° de réf. du vendeur 5510716

Contacter le vendeur

Acheter D'occasion

EUR 170,83
Autre devise
Frais de port : EUR 17,39
De Royaume-Uni vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image d'archives

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Edité par John Wiley and Sons, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : INDOO, Avenel, NJ, Etats-Unis

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. Brand New. N° de réf. du vendeur 9781848210349

Contacter le vendeur

Acheter neuf

EUR 145,11
Autre devise
Frais de port : EUR 51,51
De Etats-Unis vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image fournie par le vendeur

Artigues, Christian
Edité par ISTE LTD, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : moluna, Greven, Allemagne

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Gebunden. Etat : New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence const. N° de réf. du vendeur 597090960

Contacter le vendeur

Acheter neuf

EUR 191,11
Autre devise
Frais de port : EUR 9,70
De Allemagne vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image d'archives

Artigues
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide Edition originale

Vendeur : Kennys Bookshop and Art Galleries Ltd., Galway, GY, Irlande

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Editor(s): Artigues, Christian; Demassey, Sophie; Neron, Emmanuel. Series: ISTE. Num Pages: 288 pages, Illustrations. BIC Classification: KJMV5. Category: (UP) Postgraduate, Research & Scholarly. Dimension: 238 x 164 x 22. Weight in Grams: 612. . 2008. 1st Edition. Hardcover. . . . . N° de réf. du vendeur V9781848210349

Contacter le vendeur

Acheter neuf

EUR 205,84
Autre devise
Frais de port : EUR 3
De Irlande vers France
Destinations, frais et délais

Quantité disponible : 15 disponible(s)

Ajouter au panier

Image fournie par le vendeur

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Edité par Wiley-ISTE, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : GreatBookPricesUK, Woodford Green, Royaume-Uni

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. N° de réf. du vendeur 5510716-n

Contacter le vendeur

Acheter neuf

EUR 202,91
Autre devise
Frais de port : EUR 17,39
De Royaume-Uni vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image d'archives

Edité par Wiley-ISTE, 2008
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide

Vendeur : Ubiquity Trade, Miami, FL, Etats-Unis

Évaluation du vendeur 4 sur 5 étoiles Evaluation 4 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. Brand new! Please provide a physical shipping address. N° de réf. du vendeur 9781848210349

Contacter le vendeur

Acheter neuf

EUR 209,66
Autre devise
Frais de port : EUR 34,34
De Etats-Unis vers France
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image d'archives

Christian Artigues
ISBN 10 : 1848210345 ISBN 13 : 9781848210349
Neuf Couverture rigide Edition originale

Vendeur : Grand Eagle Retail, Mason, OH, Etats-Unis

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Hardcover. Etat : new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. N° de réf. du vendeur 9781848210349

Contacter le vendeur

Acheter neuf

EUR 185,69
Autre devise
Frais de port : EUR 64,39
De Etats-Unis vers France
Destinations, frais et délais

Quantité disponible : 1 disponible(s)

Ajouter au panier

There are 2 autres exemplaires de ce livre sont disponibles

Afficher tous les résultats pour ce livre