xiv, 144 pages : illustrations plans ; 30 cm + 1 CD-ROM. (4 3/4 in.) Construct Based on work undertaken at the European Concrete Building Project, this guide examines the operations relating to formwork and falsework, including early striking and backpropping. Generic types of formwork and falsework were monitored during use and the guide incorporates the findings of this on-site research. A major finding was that whatever the system used, the greatest potential for increased safety and economies lies at the conceptual design stage. With temporary works accounting for some 30% of the total cost of a concrete frame, the savings can be considerable.
Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.
EUR 32,07 expédition depuis Royaume-Uni vers Etats-Unis
Destinations, frais et délaisVendeur : Joseph Burridge Books, London, Royaume-Uni
Soft cover. Etat : New. xiv, 144 pages : illustrations plans ; 30 cm + 1 CD-ROM. (4 3/4 in.) Construct Based on work undertaken at the European Concrete Building Project, this guide examines the operations relating to formwork and falsework, including early striking and backpropping. Generic types of formwork and falsework were monitored during use and the guide incorporates the findings of this on-site research. A major finding was that whatever the system used, the greatest potential for increased safety and economies lies at the conceptual design stage. With temporary works accounting for some 30% of the total cost of a concrete frame, the savings can be considerable. N° de réf. du vendeur PGCONC14
Quantité disponible : 1 disponible(s)