Estimating Performance Time for Air Force Military Construction Projects - Couverture souple

Hoffman, Greg J

 
9781288397778: Estimating Performance Time for Air Force Military Construction Projects

Synopsis

The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.

Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.