Within a project human and non-human resources are pulled together in a tempo- raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri- tical Path Method) were developed. Given deterministic durations and precedence- constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta- distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.
Vendeur : ralfs-buecherkiste, Herzfelde, MOL, Allemagne
Paperback/ broschiert. Etat : Wie neu. 142 S. Mathematics Mathematik Wirtschaftsmathematik Economy Guter Zustand/ Good Ex-Library, vereinzelt Bleistiftanstreichungen ha1081829 Sprache: Englisch Gewicht in Gramm: 250. N° de réf. du vendeur 397488
Quantité disponible : 1 disponible(s)
Vendeur : Ria Christie Collections, Uxbridge, Royaume-Uni
Etat : New. In. N° de réf. du vendeur ria9783540578345_new
Quantité disponible : Plus de 20 disponibles
Vendeur : Chiron Media, Wallingford, Royaume-Uni
PF. Etat : New. N° de réf. du vendeur 6666-IUK-9783540578345
Quantité disponible : 10 disponible(s)
Vendeur : California Books, Miami, FL, Etats-Unis
Etat : New. N° de réf. du vendeur I-9783540578345
Quantité disponible : Plus de 20 disponibles
Vendeur : BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Allemagne
Taschenbuch. Etat : Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). 164 pp. Englisch. N° de réf. du vendeur 9783540578345
Quantité disponible : 2 disponible(s)
Vendeur : moluna, Greven, Allemagne
Etat : New. N° de réf. du vendeur 4894466
Quantité disponible : Plus de 20 disponibles
Vendeur : Revaluation Books, Exeter, Royaume-Uni
Paperback. Etat : Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock. N° de réf. du vendeur x-354057834X
Quantité disponible : 2 disponible(s)
Vendeur : preigu, Osnabrück, Allemagne
Taschenbuch. Etat : Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. N° de réf. du vendeur 102058116
Quantité disponible : 5 disponible(s)
Vendeur : buchversandmimpf2000, Emtmannsberg, BAYE, Allemagne
Taschenbuch. Etat : Neu. This item is printed on demand - Print on Demand Titel. Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 164 pp. Englisch. N° de réf. du vendeur 9783540578345
Quantité disponible : 1 disponible(s)
Vendeur : AHA-BUCH GmbH, Einbeck, Allemagne
Taschenbuch. Etat : Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). N° de réf. du vendeur 9783540578345
Quantité disponible : 1 disponible(s)