Articles liés à Project Managment With Dynamic Scheduling: Baseline...

Project Managment With Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control - Couverture rigide

 
9783642251740: Project Managment With Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control

Synopsis

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project's time and cost reserves.

Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.

Présentation de l'éditeur

This book covers dynamic scheduling, which is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase.

Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.

Acheter D'occasion

état :  Très bon
Zustand: Sehr gut | Seiten: 310...
Afficher cet article
EUR 149,73

Autre devise

Gratuit expédition depuis Allemagne vers France

Destinations, frais et délais

Autres éditions populaires du même titre

9783642251764: Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control

Edition présentée

ISBN 10 :  3642251765 ISBN 13 :  9783642251764
Editeur : Springer, 2012
Couverture souple

Résultats de recherche pour Project Managment With Dynamic Scheduling: Baseline...

Image d'archives

Mario Vanhoucke
Edité par Springer-Verlag GmbH, 2012
ISBN 10 : 3642251749 ISBN 13 : 9783642251740
Ancien ou d'occasion Couverture rigide

Vendeur : Buchpark, Trebbin, Allemagne

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : Sehr gut. Zustand: Sehr gut | Seiten: 310 | Sprache: Englisch | Produktart: Bücher. N° de réf. du vendeur 11379511/12

Contacter le vendeur

Acheter D'occasion

EUR 149,73
Autre devise
Frais de port : Gratuit
De Allemagne vers France
Destinations, frais et délais

Quantité disponible : 1 disponible(s)

Ajouter au panier