In a scheduling problem than considers identical machines, the job assignments can become pretty challenging, given that these jobs require the least time in their waiting line and at the same time, the total completion of the jobs need to finish as soon as possible. This is a why a bi-objective optimization problem is approached, where both makespan and total flow time need to be minimized. A mechanism proposed to solve this problem with a setting of a 2-player non-cooperative game, under tht framework of a 2x2 non-zero sum matrix; where each player aims for a different objective suggested in the scheduling problem. The scenario implied each job behaving selfishly and attempting to move to a previous position in the machine, which generated a cost for the job agent, who is attempting to minimize the total flow time; while a controlling agent is in charge of assigning the jobs to the machines in order to minimize the total completion time or makespan. As a result of the dynamic trade-offs between the agents in the repeated game, a Pareto Front set of points is obtained.
Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.
In a scheduling problem than considers identical machines, the job assignments can become pretty challenging, given that these jobs require the least time in their waiting line and at the same time, the total completion of the jobs need to finish as soon as possible. This is a why a bi-objective optimization problem is approached, where both makespan and total flow time need to be minimized. A mechanism proposed to solve this problem with a setting of a 2-player non-cooperative game, under tht framework of a 2x2 non-zero sum matrix; where each player aims for a different objective suggested in the scheduling problem. The scenario implied each job behaving selfishly and attempting to move to a previous position in the machine, which generated a cost for the job agent, who is attempting to minimize the total flow time; while a controlling agent is in charge of assigning the jobs to the machines in order to minimize the total completion time or makespan. As a result of the dynamic trade-offs between the agents in the repeated game, a Pareto Front set of points is obtained.
Industrial Engineer with a Masters in Industrial Engineering at Universidad del Norte, Barranquilla, Colombia. Scientific director of Research Center FCIMEC and professor of Universidad de la Costa and Universidad Simón Bolívar. Her research interests are in optimization of productive and logistic systems, game theory and stochastic processes.
Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.
Vendeur : moluna, Greven, Allemagne
Kartoniert / Broschiert. Etat : New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Ramirez Rios DianaIndustrial Engineer with a Masters in Industrial Engineering at Universidad del Norte, Barranquilla, Colombia. Scientific director of Research Center FCIMEC and professor of Universidad de la Costa and Universidad S. N° de réf. du vendeur 5143222
Quantité disponible : Plus de 20 disponibles
Vendeur : preigu, Osnabrück, Allemagne
Taschenbuch. Etat : Neu. Game Theoretic Approaches to Parallel Machine Scheduling | A bi-objective optimization problem viewed as a non-cooperative game of two players | Diana Ramirez Rios (u. a.) | Taschenbuch | Englisch | LAP Lambert Academic Publishing | EAN 9783659252525 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. N° de réf. du vendeur 106203785
Quantité disponible : 5 disponible(s)
Vendeur : AHA-BUCH GmbH, Einbeck, Allemagne
Taschenbuch. Etat : Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - In a scheduling problem than considers identical machines, the job assignments can become pretty challenging, given that these jobs require the least time in their waiting line and at the same time, the total completion of the jobs need to finish as soon as possible. This is a why a bi-objective optimization problem is approached, where both makespan and total flow time need to be minimized. A mechanism proposed to solve this problem with a setting of a 2-player non-cooperative game, under tht framework of a 2x2 non-zero sum matrix; where each player aims for a different objective suggested in the scheduling problem. The scenario implied each job behaving selfishly and attempting to move to a previous position in the machine, which generated a cost for the job agent, who is attempting to minimize the total flow time; while a controlling agent is in charge of assigning the jobs to the machines in order to minimize the total completion time or makespan. As a result of the dynamic trade-offs between the agents in the repeated game, a Pareto Front set of points is obtained. N° de réf. du vendeur 9783659252525
Quantité disponible : 2 disponible(s)
Vendeur : Revaluation Books, Exeter, Royaume-Uni
Paperback. Etat : Brand New. 176 pages. 8.66x5.91x0.40 inches. In Stock. N° de réf. du vendeur 3659252522
Quantité disponible : 1 disponible(s)
Vendeur : Mispah books, Redhill, SURRE, Royaume-Uni
paperback. Etat : New. NEW. SHIPS FROM MULTIPLE LOCATIONS. book. N° de réf. du vendeur ERICA82936592525226
Quantité disponible : 1 disponible(s)