Block Building Load Estimation - Couverture souple

Marzouk, Fathy

 
9783659960215: Block Building Load Estimation

Synopsis

This research aims to talk about load calculation for any block building (office buildings, hotels, residential, .etc.) Heat transmission, sun load, equipment, number of persons…etc., all of these factors affect the load calculated for any building. Equipment in air conditioning system should be known well as we selected the suitable equipment for our system. Components and types of primary refrigeration equipment (like chillers) affect the efficiency of our air conditioning system so we should to know what we are selecting for our system. Air movers (fans) should provide enough fresh air for persons according to type of activity so; they should have enough power to provide air. Piping system is very important to transport secondary refrigerant (chilled water) to air handlers. It should be designed well to reduce head that pumps should to overcome.

Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.

Présentation de l'éditeur

This research aims to talk about load calculation for any block building (office buildings, hotels, residential, .etc.) Heat transmission, sun load, equipment, number of persons...etc., all of these factors affect the load calculated for any building. Equipment in air conditioning system should be known well as we selected the suitable equipment for our system. Components and types of primary refrigeration equipment (like chillers) affect the efficiency of our air conditioning system so we should to know what we are selecting for our system. Air movers (fans) should provide enough fresh air for persons according to type of activity so; they should have enough power to provide air. Piping system is very important to transport secondary refrigerant (chilled water) to air handlers. It should be designed well to reduce head that pumps should to overcome.

Biographie de l'auteur

My name is Fathy Marzouk. I am mechanical Team leader working in mechanical field since 2006. I had finished my master in 2012 and PMP in 2013. Now i am preparing MBA.

Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.