Housed by a 4 m diameter tunnel of 27 km circumference, with huge underground labs and numerous surface facilities, and set up with a precision of 0.1 mm per kilometer, the Large Electron-Positron Collider (LEP) was not only the largest but also one of the most sophisticated scientific research instruments ever created by Man. Located at CERN, near Geneva, LEP was built during the years 1983 - 1989, was operational until 2000, and corroborated the standard model of particle physics through continuous high precision measurements.
The Author, director-general of CERN during the crucial period of the construction of LEP, recounts vividly the convoluted decision-making and technical implementation processes - the tunnel alone being a highly challenging geo- and civil engineering project - and the subsequent extremely fruitful period of scientific research. Finally he describes the difficult decision to close down LEP, at a time when the discovery of the Higgs boson seemed within reach.
LEP was eventually dismantled in 2000, enabling the tunnel to be reused for building the next generation machine, the much more powerful Large Hadron Collider (LHC), an upgrade then called LEP3 and foreseen from the beginning. It became operational just as this account was being completed.
Written by the main protagonist responsible for making LEP a reality, this is the definitive inside story of a remarkable machine and the many thousands of scientists and engineers from around the world, whose efforts contributed to the new knowledge it produced.
Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.
The author of this fascinating volume was director-general of CERN during the crucial period of the collider’s construction and recounts vividly the convoluted decision-making, technically challenging construction, and fruitful research at the facility.
Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.
Vendeur : Brook Bookstore On Demand, Napoli, NA, Italie
Etat : new. Questo è un articolo print on demand. N° de réf. du vendeur IC3RHPV64O
Quantité disponible : Plus de 20 disponibles
Vendeur : GreatBookPrices, Columbia, MD, Etats-Unis
Etat : New. N° de réf. du vendeur 27440404-n
Quantité disponible : Plus de 20 disponibles
Vendeur : Ria Christie Collections, Uxbridge, Royaume-Uni
Etat : New. In. N° de réf. du vendeur ria9783662501450_new
Quantité disponible : Plus de 20 disponibles
Vendeur : Books Puddle, New York, NY, Etats-Unis
Etat : New. pp. 223. N° de réf. du vendeur 26378179990
Quantité disponible : 4 disponible(s)
Vendeur : Chiron Media, Wallingford, Royaume-Uni
PF. Etat : New. N° de réf. du vendeur 6666-IUK-9783662501450
Quantité disponible : 10 disponible(s)
Vendeur : Majestic Books, Hounslow, Royaume-Uni
Etat : New. Print on Demand pp. 223. N° de réf. du vendeur 385691209
Quantité disponible : 4 disponible(s)
Vendeur : GreatBookPricesUK, Woodford Green, Royaume-Uni
Etat : New. N° de réf. du vendeur 27440404-n
Quantité disponible : Plus de 20 disponibles
Vendeur : BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Allemagne
Taschenbuch. Etat : Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Housed by a 4 m diameter tunnel of 27 km circumference, with huge underground labs and numerous surface facilities, and set up with a precision of 0.1 mm per kilometer, the Large Electron-Positron Collider (LEP) was not only the largest but also one of the most sophisticated scientific research instruments ever created by Man. Located at CERN, near Geneva, LEP was built during the years 1983 - 1989, was operational until 2000, and corroborated the standard model of particle physics through continuous high precision measurements. The Author, director-general of CERN during the crucial period of the construction of LEP, recounts vividly the convoluted decision-making and technical implementation processes - the tunnel alone being a highly challenging geo- and civil engineering project - and the subsequent extremely fruitful period of scientific research. Finally he describes the difficult decision to close down LEP, at a time when the discovery of the Higgs boson seemed within reach. LEP was eventually dismantled in 2000, enabling the tunnel to be reused for building the next generation machine, the much more powerful Large Hadron Collider (LHC), an upgrade then called LEP3 and foreseen from the beginning. It became operational just as this account was being completed. Written by the main protagonist responsible for making LEP a reality, this is the definitive inside story of a remarkable machine and the many thousands of scientists and engineers from around the world, whose efforts contributed to the new knowledge it produced. 224 pp. Englisch. N° de réf. du vendeur 9783662501450
Quantité disponible : 2 disponible(s)
Vendeur : Biblios, Frankfurt am main, HESSE, Allemagne
Etat : New. PRINT ON DEMAND pp. 223. N° de réf. du vendeur 18378179996
Quantité disponible : 4 disponible(s)
Vendeur : moluna, Greven, Allemagne
Etat : New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Written by the main actor in charge of making LEP a reality, this is the definitive account of the great story of a machine and the many thousands of scientists and engineers involvedHoused by a 4 m diameter tunnel of 27 km circumference, with. N° de réf. du vendeur 449137159
Quantité disponible : Plus de 20 disponibles