Articles liés à Geological Line Selection for the Qinghai-Tibet Railway...

Geological Line Selection for the Qinghai-Tibet Railway Engineering - Couverture souple

 
9783662572405: Geological Line Selection for the Qinghai-Tibet Railway Engineering

Synopsis

Is the first technological book describing the geological routing of the Qinghai-Tibetan railway project on the "roof of the world"

Explains the geological routing of the Qinghai-Tibetan railway project through permafrost plateau regions, active fault zones, meizoseismal areas, nature reserves, and regions with geohazards including steep slopes, wind and sand, and snow drifts

Illustrates the project vividly and clearly using different methods, such as quotes, figures, photographs, and tables

Les informations fournies dans la section « Synopsis » peuvent faire référence à une autre édition de ce titre.

À propos de l?auteur

Mr. Jin-Cheng Li, Vice President of China Railway First Survey & Design Institute Group, has been working as the Chief Engineer on the Qinghai-Tibetan railway construction project since 2000 and has accumulated substantial first-hand experience of railway routing in complicated geological environment on Qinghai-Tibetan plateau, such as railway routing in permafrost regions, active fault zones, meizoseismal areas, natural reserves, slope-geohazard regions, as well as geothermal, windy-sand, and snow drift hazard regions. He has several important publications to his name and has won a number of honors for his outstanding contributions to the construction of more than ten national key railway projects.

Selected Publications:

1. Jin-Cheng Li, Design of Access Tunnels for Guanjiao Super-long Tunnel, Modern Tunneling Technology, 46 (2009) 1-7

2. Jin-Cheng Li, Waterproofing and Drainage Measures Adopted in Guanjiao Super-long Railway Tunnel, Modern Tunneling Tec

hnology, 5 (2008) 65-71

3. Jin-Cheng Li, Frost Damages in Permafrost Regions along the Qinghai-Tibet Railway in 2001-2006:Investigation and Analysis, Journal of Glaciology and Geocryology, 30 (2008) 147-152

4. Jin-Cheng Li, Research on Geological Route Selection in Valley Zone between Semai-Dazhuca of Lhasa-Rikaze Railway, Journal of Railway Engineering Society, 1 (2008) 22-25

5. Jin-Cheng Li, Mutually Supportive Relationship between Engineering and Environment, Chinese National Geography, 2 (2004) 20-22

6. Jin-Cheng Li, Research on Route Selection Scheme of Lhasa-Rikaze Railway in Brahmaputra's Canyon Area, Railway Investigation and Surveying, 5 (2007) 1-6

7. Jin-Cheng Li, A Summary for Engineering Geology in Guanjiao Super Long Railway Tunnel, Railway Investigation and Surveying, 6 (2007) 1-4

8. Jin-Cheng Li, Location Scheme Research for Rikaze Railway, Gansu Science and Technology, 24 (2008) 92-94

9. Jin-Cheng Li, Research on L

ocation of Geothermic Tunnel of Lhasa-Rikaze Railway, Journal of Railway Engineering Society, 4 (2011) 42-46

Honors:

1. Qinghai-Tibetan railway project has won the outstanding award of National Science and Technology Progress Special Award in 2008. The chief engineer of Qinghai-Tibetan railway project, Mr. Jin-Cheng Li, was ranked as the second contributor. Award No. 2008-J-221-0-01-R02

2. The whole railway design from Golmud to Lhasa of Qinghai-Tibetan railway project has won the gold prize of national excellent project of ministry of railways in 2008. Mr. Jin-Cheng Li, was ranked as the first contributor.

3. The whole railway design from Golmud to Lhasa of Qinghai-Tibetan railway project has won the outstanding award of national excellent project of ministry of railways in 2007. Mr. Jin-Cheng Li, was ranked as the first contributor.

4. Technique on permafrost of Qinghai-Tibetan railway project has won the outstanding award of Chineserailway so

ciety in 2007. Award No. 2007-066

5. The design of active protection of permafrost roadbed in Qinghai-Tibetan railway project has won the first prize of excellent design of China Railway Construction Corporation in 2007. Award No. SJ-2007-02-02

6. 1:2000 digital topographical map from Golmud to Lhasa of Qinghai-Tibetan railway project by aerial survey has won the bronze prize for national excellent project survey and design of ministry of railways in 2006. Mr. Jin-Cheng Li was ranked as the second contributor.

7. Mr. Jin-Cheng Li was awarded as the pacesetter of national science and technology 2008.

8. Mr. Jin-Cheng Li was awarded the certificate of special government allowances of the state council in 2007.

9. Mr. Jin-Cheng Li was awarded the certificate of national excellent scientific and technological worker in 2005.

Les informations fournies dans la section « A propos du livre » peuvent faire référence à une autre édition de ce titre.

Acheter neuf

Afficher cet article
EUR 106,99

Autre devise

EUR 23 expédition depuis Allemagne vers Etats-Unis

Destinations, frais et délais

Autres éditions populaires du même titre

9783662555705: Geological Line Selection for the Qinghai-tibet Railway Engineering

Edition présentée

ISBN 10 :  3662555700 ISBN 13 :  9783662555705
Editeur : Springer-Verlag Berlin and Heide..., 2017
Couverture rigide

Résultats de recherche pour Geological Line Selection for the Qinghai-Tibet Railway...

Image fournie par le vendeur

Jincheng Li
ISBN 10 : 3662572400 ISBN 13 : 9783662572405
Neuf Taschenbuch
impression à la demande

Vendeur : BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Allemagne

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Taschenbuch. Etat : Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This book describes the second phase of the Qinghai-Tibetan railway construction project and is the first technological book discussing the geological routing of the Qinghai-Tibetan railway project on the 'roof of the world.' Based on practical experience of railway construction work, it provides a substantial number of examples with detailed descriptions and conclusions. The complex geological environment of the Qinghai-Tibetan railway as well as the selection and optimization of the route are illustrated vividly and clearly with quotes, figures, photos, and tables. Connecting Golmud and Lhasa, it has a total length of 1142 km and at the Tanggula Pass has an altitude of 5072m-higher than any other in the world. A 960 km section is on a plateau at altitudes above 4000 m, and 550 km are in the permafrost region, making it the world's longest and highest railway in the permafrost plateau region. The book is a model for the integration of theory and practice, making it a valuable reference source for civil engineering professionals working in geological routing in permafrost plateau regions, active fault zones, meizoseismal areas, nature reserves, and regions with geohazards such as steep slopes, sand and snow drifts and geothermal hazards. 336 pp. Englisch. N° de réf. du vendeur 9783662572405

Contacter le vendeur

Acheter neuf

EUR 106,99
Autre devise
Frais de port : EUR 23
De Allemagne vers Etats-Unis
Destinations, frais et délais

Quantité disponible : 2 disponible(s)

Ajouter au panier

Image fournie par le vendeur

Jincheng Li|Wenwu Chen|Zhengping Liu
Edité par Springer Berlin Heidelberg, 2018
ISBN 10 : 3662572400 ISBN 13 : 9783662572405
Neuf Couverture souple

Vendeur : moluna, Greven, Allemagne

Évaluation du vendeur 4 sur 5 étoiles Evaluation 4 étoiles, En savoir plus sur les évaluations des vendeurs

Etat : New. N° de réf. du vendeur 449139563

Contacter le vendeur

Acheter neuf

EUR 92,27
Autre devise
Frais de port : EUR 48,99
De Allemagne vers Etats-Unis
Destinations, frais et délais

Quantité disponible : Plus de 20 disponibles

Ajouter au panier

Image fournie par le vendeur

Jincheng Li
ISBN 10 : 3662572400 ISBN 13 : 9783662572405
Neuf Taschenbuch

Vendeur : buchversandmimpf2000, Emtmannsberg, BAYE, Allemagne

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Taschenbuch. Etat : Neu. Neuware -This book describes the second phase of the Qinghai¿Tibetan railway construction project and is the first technological book discussing the geological routing of the Qinghai¿Tibetan railway project on the ¿roof of the world.¿ Based on practical experience of railway construction work, it provides a substantial number of examples with detailed descriptions and conclusions. The complex geological environment of the Qinghai¿Tibetan railway as well as the selection and optimization of the route are illustrated vividly and clearly with quotes, figures, photos, and tables. Connecting Golmud and Lhasa, it has a total length of 1142 km and at the Tanggula Pass has an altitude of 5072m¿higher than any other in the world. A 960 km section is on a plateau at altitudes above 4000 m, and 550 km are in the permafrost region, making it the world¿s longest and highest railway in the permafrost plateau region. The book is a model for the integration of theory and practice, making it a valuable reference source for civil engineering professionals working in geological routing in permafrost plateau regions, active fault zones, meizoseismal areas, nature reserves, and regions with geohazards such as steep slopes, sand and snow drifts and geothermal hazards.Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 336 pp. Englisch. N° de réf. du vendeur 9783662572405

Contacter le vendeur

Acheter neuf

EUR 106,99
Autre devise
Frais de port : EUR 60
De Allemagne vers Etats-Unis
Destinations, frais et délais

Quantité disponible : 2 disponible(s)

Ajouter au panier

Image fournie par le vendeur

Jincheng Li
Edité par Springer Berlin Heidelberg, 2018
ISBN 10 : 3662572400 ISBN 13 : 9783662572405
Neuf Taschenbuch

Vendeur : AHA-BUCH GmbH, Einbeck, Allemagne

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Taschenbuch. Etat : Neu. Druck auf Anfrage Neuware - Printed after ordering - This book describes the second phase of the Qinghai-Tibetan railway construction project and is the first technological book discussing the geological routing of the Qinghai-Tibetan railway project on the 'roof of the world.' Based on practical experience of railway construction work, it provides a substantial number of examples with detailed descriptions and conclusions. The complex geological environment of the Qinghai-Tibetan railway as well as the selection and optimization of the route are illustrated vividly and clearly with quotes, figures, photos, and tables. Connecting Golmud and Lhasa, it has a total length of 1142 km and at the Tanggula Pass has an altitude of 5072m-higher than any other in the world. A 960 km section is on a plateau at altitudes above 4000 m, and 550 km are in the permafrost region, making it the world's longest and highest railway in the permafrost plateau region. The book is a model for the integration of theory and practice, making it a valuable reference source for civil engineering professionals working in geological routing in permafrost plateau regions, active fault zones, meizoseismal areas, nature reserves, and regions with geohazards such as steep slopes, sand and snow drifts and geothermal hazards. N° de réf. du vendeur 9783662572405

Contacter le vendeur

Acheter neuf

EUR 106,99
Autre devise
Frais de port : EUR 62,56
De Allemagne vers Etats-Unis
Destinations, frais et délais

Quantité disponible : 1 disponible(s)

Ajouter au panier

Image d'archives

Jincheng Li
Edité par Springer, 2018
ISBN 10 : 3662572400 ISBN 13 : 9783662572405
Neuf Paperback

Vendeur : Revaluation Books, Exeter, Royaume-Uni

Évaluation du vendeur 5 sur 5 étoiles Evaluation 5 étoiles, En savoir plus sur les évaluations des vendeurs

Paperback. Etat : Brand New. reprint edition. 336 pages. 9.25x6.10x0.76 inches. In Stock. N° de réf. du vendeur 3662572400

Contacter le vendeur

Acheter neuf

EUR 160,38
Autre devise
Frais de port : EUR 14,40
De Royaume-Uni vers Etats-Unis
Destinations, frais et délais

Quantité disponible : 1 disponible(s)

Ajouter au panier