Architectural Project Delivery (Paperback)
Langue : anglais
Edité par Independently Published, 2026
- Livre broché
- Neuf

Vendeur : CitiRetail, Stevenage, Royaume-UniCitiRetail
Vendeur AbeBooks depuis 29 juin 2022
Etat: Neuf
EUR 79,29
Quantité disponible : 1 disponible
Ajouter au panierA propos de cet article
Paperback. The drawings were complete. The contract was signed. The schedule was baselined. And the project still stalled in a conference room, because no one could say who was entitled to decide, what information had to exist before the decision was valid, or what record would authorize the field to act on it.That failure is structural rather than technical. Delivery method, procurement method, contract form, management model, and production system are routinely discussed as though they were a single decision. They are five, and confusing them is the most common and most expensive error in capital delivery. The consequences surface later as unclear design liability, price certainty that arrives too late to matter, risk sitting with the party least able to carry it, changes priced before anyone classified them, and a closeout that stops rather than ends.This twenty-chapter guide separates those layers and rebuilds them into a working model, from owner readiness through post-occupancy review. The treatment is procedural rather than theoretical: where a decision requires a document, the document is named; where a process depends on a response time, the response time is discussed. Read it straight through as a course in delivery, or open it at the chapter that matches the decision on your desk this week.Inside this guide you will: Tell the five delivery choices apart and make each one deliberately, then match a method to the project through selection criteria, public-sector constraints, and a side-by-side comparison of the major delivery families.Test whether an owner organization is genuinely ready, using decision rights, risk appetite, budget architecture, and a readiness gate that precedes procurement.Run design-build with discipline: team organization, qualifications and best-value procurement, criteria packages and bridging documents, design-to-release gates, and construction-phase administration.Make integration real rather than nominal, through validation, risk pool and incentive structure, open-book cost, lean planning, and information and model governance.Convert contract documents into governed field action through submittals, requests for information, supplemental instructions, observation planned around irreversibility, testing, and defensible disposition of nonconforming work.Classify change before pricing it, test the build-up rather than the bottom line, evaluate time impact on cause and logic, and certify payment applications on evidence.Close projects on criteria rather than optimism: substantial completion, punch lists, commissioning, owner training, record documents, warranties, and final payment.The apparatus is built for daily use: sixty analytical figures, worked scenarios from public institutional, healthcare, university and civic projects, chapter sources, a glossary of working terms, and three appendices giving a delivery method comparison matrix, a construction administration document register, and a grouped closeout checklist.One caution belongs at the front. The book discusses standard contract families and industry practice in general terms. It is not legal advice and cannot describe the agreement you signed; your executed documents, your jurisdiction, and your counsel govern.It is written for the people who carry delivery risk: owners and owner representatives who must select a method and live with it, architects and engineers administering construction contracts, design-build and construction management practitioners, project and program managers, public agency capital staff, and students and examination candidates who need the reasoning behind the terminology rather than the terminology alone.Open this guide at the decision in front of you and start running pro Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
N° de réf. du vendeur 9798170464289
- Titre
- Architectural Project Delivery (Paperback)
- Auteur
- Nolan C. Whitmore
- Éditeur
- Independently Published
- Année de publication
- 2026
- État de l'article
- new
- Reliure
- Paperback
- Langue
- anglais
- ISBN à 13 chiffres
- 9798170464289
The drawings were complete. The contract was signed. The schedule was baselined. And the project still stalled in a conference room, because no one could say who was entitled to decide, what information had to exist before the decision was valid, or what record would authorize the field to act on it.
That failure is structural rather than technical. Delivery method, procurement method, contract form, management model, and production system are routinely discussed as though they were a single decision. They are five, and confusing them is the most common and most expensive error in capital delivery. The consequences surface later as unclear design liability, price certainty that arrives too late to matter, risk sitting with the party least able to carry it, changes priced before anyone classified them, and a closeout that stops rather than ends.
This twenty-chapter guide separates those layers and rebuilds them into a working model, from owner readiness through post-occupancy review. The treatment is procedural rather than theoretical: where a decision requires a document, the document is named; where a process depends on a response time, the response time is discussed. Read it straight through as a course in delivery, or open it at the chapter that matches the decision on your desk this week.
Inside this guide you will:
- Tell the five delivery choices apart and make each one deliberately, then match a method to the project through selection criteria, public-sector constraints, and a side-by-side comparison of the major delivery families.
- Test whether an owner organization is genuinely ready, using decision rights, risk appetite, budget architecture, and a readiness gate that precedes procurement.
- Run design-build with discipline: team organization, qualifications and best-value procurement, criteria packages and bridging documents, design-to-release gates, and construction-phase administration.
- Make integration real rather than nominal, through validation, risk pool and incentive structure, open-book cost, lean planning, and information and model governance.
- Convert contract documents into governed field action through submittals, requests for information, supplemental instructions, observation planned around irreversibility, testing, and defensible disposition of nonconforming work.
- Classify change before pricing it, test the build-up rather than the bottom line, evaluate time impact on cause and logic, and certify payment applications on evidence.
- Close projects on criteria rather than optimism: substantial completion, punch lists, commissioning, owner training, record documents, warranties, and final payment.
The apparatus is built for daily use: sixty analytical figures, worked scenarios from public institutional, healthcare, university and civic projects, chapter sources, a glossary of working terms, and three appendices giving a delivery method comparison matrix, a construction administration document register, and a grouped closeout checklist.
One caution belongs at the front. The book discusses standard contract families and industry practice in general terms. It is not legal advice and cannot describe the agreement you signed; your executed documents, your jurisdiction, and your counsel govern.
It is written for the people who carry delivery risk: owners and owner representatives who must select a method and live with it, architects and engineers administering construction contracts, design-build and construction management practitioners, project and program managers, public agency capital staff, and students and examination candidates who need the reasoning behind the terminology rather than the terminology alone.
Open this guide at the decision in front of you and start running project delivery as a system instead of inheriting one by default.
« Synopsis » peut appartenir à une autre édition de cet ouvrage.
CitiRetail
Stevenage, Royaume-Uni
Vendeur AbeBooks depuis 29 juin 2022
Frais d'expédition de Royaume-Uni vers Etats-Unis
| Article | 7 à 14 jours ouvrés | 7 à 60 jours ouvrés |
|---|---|---|
| Premier article | EUR 43,16 | EUR 43,16 |
Modes de paiement
Description de la boutique
Online business
Profil professionnel du vendeur
ABC BOOKS LIMITED
10 John Street
London, Royaume-Uni WC1N 2EB
Conditions de vente
Orders can be returned within 30 days of receipt.
Droit de rétractation
Si vous êtes un consommateur, vous pouvez exercer votre droit de rétractation sur le contrat conformément à ce qui suit. Le mot « consommateur » désigne toute personne physique agissant à des fins qui n'entrent pas dans le cadre de son activité commerciale, artisanale ou professionnelle.
Informations concernant le droit de rétractation
Droit statutaire de rétractation
Vous avez le droit d'exercer votre droit de rétractation sur ce contrat dans les 14 jours sans donner de raison.
Le délai de rétractation expirera au bout de 14 jours à compter du jour où vous-même, ou un tiers autre que le transporteur et désigné par vous, prendrez physiquement possession de la dernière marchandise, du dernier lot ou de la dernière pièce.
Pour exercer votre droit de rétractation, remplissez électroniquement et envoyez une déclaration claire sur notre site Web, sous « Vos achats » dans « Votre compte ». Nous vous communiquerons sans délai un accusé de réception de cette rétractation sur un support durable (par exemple, par e-mail).
Pour respecter le délai de rétractation, il vous suffit d'envoyer votre message concernant l'exercice de votre droit de rétractation avant l'expiration du délai de rétractation.
Effets de la rétractation
Si vous exercez votre droit de rétractation sur ce contrat, nous vous rembourserons tous les paiements que vous avez effectués, y compris les frais de livraison (à l'exception des frais supplémentaires résultant du choix d'un mode de livraison autre que le type de livraison standard le moins cher que nous proposons).
Nous pouvons déduire du remboursement la perte de valeur de toute marchandise livrée, si la perte est le résultat d'une manipulation inutile de votre part.
Nous effectuerons le remboursement dans les meilleurs délais, et au plus tard 14 jours après le jour où nous aurons été informés de votre décision d'exercer votre droit de rétractation sur ce contrat.
Nous effectuerons le remboursement en utilisant le même moyen de paiement que celui que vous avez utilisé pour la transaction initiale, sauf si vous en avez expressément convenu autrement ; en tout état de cause, aucuns frais ne vous seront facturés à la suite d'un tel remboursement.
Nous pouvons suspendre le remboursement jusqu'à ce que nous ayons reçu les marchandises ou que vous ayez fourni la preuve que vous avez renvoyé les marchandises, en fonction de la première éventualité.
Vous devez renvoyer les marchandises ou les remettre à CitiRetail, Stevenage, United Kingdom, sans retard injustifié et, en tout état de cause, au plus tard 14 jours à compter du jour où vous nous avez communiqué votre décision de rétractation du présent contrat. Le délai est respecté si vous renvoyez les marchandises avant l'expiration du délai de 14 jours. Vous devrez prendre en charge les frais directs du renvoi des marchandises. Vous n'êtes responsable que de toute diminution de valeur des marchandises résultant d'une manipulation autre que celle nécessaire pour établir la nature, les caractéristiques et le fonctionnement des marchandises.
Exceptions au droit de rétractation
Le droit de rétractation ne s'applique pas à ce qui suit :
- Distribution de journaux, de revues ou de magazines, à l'exception des contrats d'abonnement ; et
- Fourniture d'un contenu numérique qui n'est pas fourni sur un support matériel (par exemple, sur un CD ou un DVD) si vous avez accepté, lors de votre commande, que nous puissions commencer à le livrer et que vous ne puissiez pas exercer votre droit de rétractation une fois la livraison commencée.
Conditions d'expédition
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.