Construction Quality & Rework Prevention (Paperback)
Langue : anglais
Edité par Independently Published, 2026
Série : Livre 7 sur 10 - The Construction Project Manager Series
- Livre broché
- Neuf

Vendeur : CitiRetail, Stevenage, Royaume-UniCitiRetail
Vendeur AbeBooks depuis 29 juin 2022
Etat: Neuf
EUR 24,08
Quantité disponible : 1 disponible
Ajouter au panierA propos de cet article
Paperback. The waterproofing membrane looked finished. Miguel Santos had walked it, clipboard in hand, and told you it was ready. Then the inspection failed. It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery-a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare. In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework. Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time: Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.Avoid "Closeout Debt" Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.The Quality Prevention Toolkit Included Each of the 15 chapters closes with a field-tested, printable template to establish a proactive site rhythm: Project Quality Control SheetWorkfront Quality Readiness GatePre-Installation Quality ChecklistSubcontractor Quality Performance ScorecardRepetitive Defect Early-Warning RegisterWeekly Quality Control Meeting TemplateAnd 13 other high-impact quality tools.The cheapest defect is the one the project prevents before it is built. Scroll up, grab your copy of Book Seven today, and t Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
N° de réf. du vendeur 9798171923877
- Titre
- Construction Quality & Rework Prevention (Paperback)
- Auteur
- Daniel R. Whitmore
- Éditeur
- Independently Published
- Année de publication
- 2026
- État de l'article
- new
- Reliure
- Paperback
- Langue
- anglais
- ISBN à 13 chiffres
- 9798171923877
- Série
- Livre 7 sur 10: The Construction Project Manager Series
It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery—a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare.
In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework.
Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time:
- Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.
- Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.
- Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.
- Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.
- Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.
- Avoid "Closeout Debt": Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.
- Project Quality Control Sheet
- Workfront Quality Readiness Gate
- Pre-Installation Quality Checklist
- Subcontractor Quality Performance Scorecard
- Repetitive Defect Early-Warning Register
- Weekly Quality Control Meeting Template
- And 13 other high-impact quality tools.
« Synopsis » peut appartenir à une autre édition de cet ouvrage.
CitiRetail
Stevenage, Royaume-Uni
Vendeur AbeBooks depuis 29 juin 2022
Frais d'expédition de Royaume-Uni vers Etats-Unis
| Article | 7 à 14 jours ouvrés | 7 à 60 jours ouvrés |
|---|---|---|
| Premier article | EUR 44,39 | EUR 44,39 |
Modes de paiement
Description de la boutique
Online business
Profil professionnel du vendeur
ABC BOOKS LIMITED
10 John Street
London, Royaume-Uni WC1N 2EB
Conditions de vente
Orders can be returned within 30 days of receipt.
Droit de rétractation
Si vous êtes un consommateur, vous pouvez exercer votre droit de rétractation sur le contrat conformément à ce qui suit. Le mot « consommateur » désigne toute personne physique agissant à des fins qui n'entrent pas dans le cadre de son activité commerciale, artisanale ou professionnelle.
Informations concernant le droit de rétractation
Droit statutaire de rétractation
Vous avez le droit d'exercer votre droit de rétractation sur ce contrat dans les 14 jours sans donner de raison.
Le délai de rétractation expirera au bout de 14 jours à compter du jour où vous-même, ou un tiers autre que le transporteur et désigné par vous, prendrez physiquement possession de la dernière marchandise, du dernier lot ou de la dernière pièce.
Pour exercer votre droit de rétractation, remplissez électroniquement et envoyez une déclaration claire sur notre site Web, sous « Vos achats » dans « Votre compte ». Nous vous communiquerons sans délai un accusé de réception de cette rétractation sur un support durable (par exemple, par e-mail).
Pour respecter le délai de rétractation, il vous suffit d'envoyer votre message concernant l'exercice de votre droit de rétractation avant l'expiration du délai de rétractation.
Effets de la rétractation
Si vous exercez votre droit de rétractation sur ce contrat, nous vous rembourserons tous les paiements que vous avez effectués, y compris les frais de livraison (à l'exception des frais supplémentaires résultant du choix d'un mode de livraison autre que le type de livraison standard le moins cher que nous proposons).
Nous pouvons déduire du remboursement la perte de valeur de toute marchandise livrée, si la perte est le résultat d'une manipulation inutile de votre part.
Nous effectuerons le remboursement dans les meilleurs délais, et au plus tard 14 jours après le jour où nous aurons été informés de votre décision d'exercer votre droit de rétractation sur ce contrat.
Nous effectuerons le remboursement en utilisant le même moyen de paiement que celui que vous avez utilisé pour la transaction initiale, sauf si vous en avez expressément convenu autrement ; en tout état de cause, aucuns frais ne vous seront facturés à la suite d'un tel remboursement.
Nous pouvons suspendre le remboursement jusqu'à ce que nous ayons reçu les marchandises ou que vous ayez fourni la preuve que vous avez renvoyé les marchandises, en fonction de la première éventualité.
Vous devez renvoyer les marchandises ou les remettre à CitiRetail, Stevenage, United Kingdom, sans retard injustifié et, en tout état de cause, au plus tard 14 jours à compter du jour où vous nous avez communiqué votre décision de rétractation du présent contrat. Le délai est respecté si vous renvoyez les marchandises avant l'expiration du délai de 14 jours. Vous devrez prendre en charge les frais directs du renvoi des marchandises. Vous n'êtes responsable que de toute diminution de valeur des marchandises résultant d'une manipulation autre que celle nécessaire pour établir la nature, les caractéristiques et le fonctionnement des marchandises.
Exceptions au droit de rétractation
Le droit de rétractation ne s'applique pas à ce qui suit :
- Distribution de journaux, de revues ou de magazines, à l'exception des contrats d'abonnement ; et
- Fourniture d'un contenu numérique qui n'est pas fourni sur un support matériel (par exemple, sur un CD ou un DVD) si vous avez accepté, lors de votre commande, que nous puissions commencer à le livrer et que vous ne puissiez pas exercer votre droit de rétractation une fois la livraison commencée.
Conditions d'expédition
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.