Vendeur
preigu, Osnabrück, Allemagne
Évaluation du vendeur 5 sur 5 étoiles
Vendeur AbeBooks depuis 5 août 2024
Environmental Monitoring: A Case Study of Puttalam Coal Power Project | Prasad Jayaweera | Taschenbuch | 144 S. | Englisch | 2017 | LAP LAMBERT Academic Publishing | EAN 9786202005920 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. N° de réf. du vendeur 109579809
The importance of this management tool to foresee potential environmental impacts and problems caused by proposed prescribed projects under the National Environmental Act and its use as a means to make projects more suitable to the environment are highly appreciative in terms of environmental conservation. The status of monitoring reflects clearly that more than 95% of monitoring indicators have not been monitored. Air emissions including TSPM are within the stipulated standards, Noise levels are within permissible levels and wastewater and water quality parameters comply with the tolerance limits. Discharged cooling water temperature is +40C higher than intake temperature and by increasing the heated water volume up to 54 m3/s, a further temperature increase could be expected. PCPP-CEB is operating without an Environmental Protection License (EPL) from its commissioned date which is a pre-requisite as per the law an industry to operate. Ignorance of placing a proper monitoring framework as stipulated in the EIA Report, the CEA and the Provincial Environmental Authority of North Western Province has lost of gaining the maximum advantage of mitigating impacts.
À propos de l?auteur: Author, Mr. J.A.P. Jayaweera completed his Bachelor of Management Studies degree at OUSL, PgDEM at University of Colombo has long career in the fields of Project Management and Environmental Management. His publication is based on his thesis for the Masters degree in Environmental Management (UOC, SL). Jayaweera was supervised by Prof. Jayatunga.
Titre : Environmental Monitoring: A Case Study of ...
Éditeur : LAP LAMBERT Academic Publishing
Date d'édition : 2017
Reliure : Taschenbuch
Etat : Neu
Vendeur : moluna, Greven, Allemagne
Etat : New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Jayaweera PrasadAuthor, Mr. J.A.P. Jayaweera completed his Bachelor of Management Studies degree at OUSL, PgDEM at University of Colombo has long career in the fields of Project Management and Environmental Management. His publicatio. N° de réf. du vendeur 159121844
Quantité disponible : Plus de 20 disponibles
Vendeur : BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Allemagne
Taschenbuch. Etat : Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The importance of this management tool to foresee potential environmental impacts and problems caused by proposed prescribed projects under the National Environmental Act and its use as a means to make projects more suitable to the environment are highly appreciative in terms of environmental conservation. The status of monitoring reflects clearly that more than 95% of monitoring indicators have not been monitored. Air emissions including TSPM are within the stipulated standards, Noise levels are within permissible levels and wastewater and water quality parameters comply with the tolerance limits. Discharged cooling water temperature is +40C higher than intake temperature and by increasing the heated water volume up to 54 m3/s, a further temperature increase could be expected. PCPP-CEB is operating without an Environmental Protection License (EPL) from its commissioned date which is a pre-requisite as per the law an industry to operate. Ignorance of placing a proper monitoring framework as stipulated in the EIA Report, the CEA and the Provincial Environmental Authority of North Western Province has lost of gaining the maximum advantage of mitigating impacts. 144 pp. Englisch. N° de réf. du vendeur 9786202005920
Quantité disponible : 2 disponible(s)
Vendeur : buchversandmimpf2000, Emtmannsberg, BAYE, Allemagne
Taschenbuch. Etat : Neu. This item is printed on demand - Print on Demand Titel. Neuware -The importance of this management tool to foresee potential environmental impacts and problems caused by proposed prescribed projects under the National Environmental Act and its use as a means to make projects more suitable to the environment are highly appreciative in terms of environmental conservation. The status of monitoring reflects clearly that more than 95% of monitoring indicators have not been monitored. Air emissions including TSPM are within the stipulated standards, Noise levels are within permissible levels and wastewater and water quality parameters comply with the tolerance limits. Discharged cooling water temperature is +40C higher than intake temperature and by increasing the heated water volume up to 54 m3/s, a further temperature increase could be expected. PCPP-CEB is operating without an Environmental Protection License (EPL) from its commissioned date which is a pre-requisite as per the law an industry to operate. Ignorance of placing a proper monitoring framework as stipulated in the EIA Report, the CEA and the Provincial Environmental Authority of North Western Province has lost of gaining the maximum advantage of mitigating impacts.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 144 pp. Englisch. N° de réf. du vendeur 9786202005920
Quantité disponible : 1 disponible(s)
Vendeur : AHA-BUCH GmbH, Einbeck, Allemagne
Taschenbuch. Etat : Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The importance of this management tool to foresee potential environmental impacts and problems caused by proposed prescribed projects under the National Environmental Act and its use as a means to make projects more suitable to the environment are highly appreciative in terms of environmental conservation. The status of monitoring reflects clearly that more than 95% of monitoring indicators have not been monitored. Air emissions including TSPM are within the stipulated standards, Noise levels are within permissible levels and wastewater and water quality parameters comply with the tolerance limits. Discharged cooling water temperature is +40C higher than intake temperature and by increasing the heated water volume up to 54 m3/s, a further temperature increase could be expected. PCPP-CEB is operating without an Environmental Protection License (EPL) from its commissioned date which is a pre-requisite as per the law an industry to operate. Ignorance of placing a proper monitoring framework as stipulated in the EIA Report, the CEA and the Provincial Environmental Authority of North Western Province has lost of gaining the maximum advantage of mitigating impacts. N° de réf. du vendeur 9786202005920
Quantité disponible : 1 disponible(s)
Vendeur : Revaluation Books, Exeter, Royaume-Uni
Paperback. Etat : Brand New. 144 pages. 8.66x5.91x0.33 inches. In Stock. N° de réf. du vendeur zk6202005920
Quantité disponible : 1 disponible(s)