Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)

Langue : anglais

Edité par IWA Publishing, London, 2004

1843397161 / 9781843397168

Vendeur : AussieBookSeller, Truganina, VIC, AustralieAussieBookSeller

Vendeur avec une évaluation de 5 étoiles

Vendeur AbeBooks depuis 22 juin 2007

Livre broché

Etat: Neuf

EUR 271,74

EUR 33,04 expédition 
Expédition depuis Australie vers Etats-Unis

Quantité disponible : 1 disponible

Ajouter au panier
Retours gratuits sous 30 jours

A propos de cet article

Paperback. Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their 'asset base'. Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance.Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Phase 1 also involves establishment of protocols for whole-life costs and performance data for BMPs and SUDS. Protocols for whole-life costs will be published separately. An additional outcome of Phase 1 will be the selection of a limited number of BMPs and SUDS authorities or sites for qualitative or quantitative monitoring and further assessment during Phase 2.As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability.…

N° de réf. du vendeur 9781843397168

Titre
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)
Auteur
L.K. Lampe
Éditeur
IWA Publishing, London
Année de publication
2004
État de l'article
new
Reliure
Paperback
Langue
anglais
ISBN à 10 chiffres
1843397161
ISBN à 13 chiffres
9781843397168

AussieBookSeller

Truganina, VIC, Australie

Vendeur avec une évaluation de 5 étoiles

Vendeur AbeBooks depuis 22 juin 2007

Frais d'expédition de Australie vers Etats-Unis

Article25 à 45 jours ouvrés8 à 14 jours ouvrés
Premier articleEUR 33,04EUR 39,28
Les délais de livraison sont fixés par les vendeurs et varient en fonction du transporteur et du lieu. Les commandes transitant par les douanes peuvent être retardées et les acheteurs sont responsables de tous les droits ou frais associés. Les vendeurs peuvent vous contacter au sujet de frais supplémentaires afin de couvrir toute augmentation des coûts d'expédition de vos articles.

Modes de paiement

  • Visa
  • Mastercard
  • American Express
  • Carte Bleue
  • Apple Pay
  • Google Pay

Profil professionnel du vendeur

The Nile Group Pty Ltd

42 Apex Drive
Truganina, VIC Australie 3029