Vendeur
preigu, Osnabrück, Allemagne
Évaluation du vendeur 5 sur 5 étoiles
Vendeur AbeBooks depuis 5 août 2024
SIMULATION OF HYDROPOWER ENERGY GENERATION | Case Study for the Development and Optimization of Lower Spat Gah (Ls) Scheme | Waqar-Ur Rehman (u. a.) | Taschenbuch | Englisch | VDM Verlag Dr. Müller | EAN 9783639232066 | Verantwortliche Person für die EU: VDM Verlag Dr. Müller, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu. N° de réf. du vendeur 101369911
Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.
Présentation de l'éditeur: Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.
Titre : SIMULATION OF HYDROPOWER ENERGY GENERATION |...
Éditeur : VDM Verlag Dr. Müller
Date d'édition : 2010
Reliure : Taschenbuch
Etat : Neu
Vendeur : moluna, Greven, Allemagne
Kartoniert / Broschiert. Etat : New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: LATIF MUHAMMADMUHAMMAD LATIF, PhD: Irrigation and Drainage and ProfessorTAHIRA M.ALI, M.Sc Scholar SAJID MAHMOOD,PhD: Water Resources Management and Assistant Professor at CEWRE Lahore- Pakistan.Autor/Autorin: MAHMOOD SAJ. N° de réf. du vendeur 4969397
Quantité disponible : Plus de 20 disponibles
Vendeur : AHA-BUCH GmbH, Einbeck, Allemagne
Taschenbuch. Etat : Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally. N° de réf. du vendeur 9783639232066
Quantité disponible : 2 disponible(s)
Vendeur : Mispah books, Redhill, SURRE, Royaume-Uni
Paperback. Etat : Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book. N° de réf. du vendeur ERICA75836392320626
Quantité disponible : 1 disponible(s)