National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
Edité par United States General Accounting Office, Washington DC, 1993
- Éd. originale
- Livre broché
- Occasion
Vendeur : Ground Zero Books, Ltd., Silver Spring, MD, Etats-UnisGround Zero Books, Ltd.
Vendeur AbeBooks depuis 14 août 1998
Etat: Occasion - Assez bon
EUR 32,04
Quantité disponible : 1 disponible
Ajouter au panierA propos de cet article
12 pages, plus covers. This is a "Report to Congressional Requesters". Pursuant to a congressional request, GAO reviewed the National Aero-Space Plane (NASP) Program, focusing on the: (1) status of efforts to resolve the program's cost, schedule, and technical problems; and (2) lack of top-level management direction. The presidentially directed NASP Program is a joint Department of Defense (DoD)/National Aeronautics and Space Administration (NASA) technology development and demonstration program. The program's goal is to provide the technological basis for future space launch and hypersonic flight vehicles by developing critical or enabling technologies, such as the scramjet engine. DOD and NASA intended to demonstrate these technologies by building and testing the X-30, a manned experimental flight vehicle that is to be capable of single-stage-to-orbit (SSTO) flight. The concept is to develop a vehicle that can take off horizontally from a runway; reach hypersonic speeds of up to 25 times the speed of sound (Mach 25); and attain low earth orbit, without the use of external booster rockets or propellant tanks. The program currently consists of three phases. Phase I (1982 to 1985), which preceded the formal initiation of the program, evaluated the feasibility and technical concept for an aerospace plane. Phase II (1985 to 1994) is a technology development and maturation phase. The program was in the final segment of phase II, which was intended to develop the critical technologies and manufacturing processes, build and test specific structural articles, and test a subscale engine to demonstrate the propulsion system's concept. A decision was to be made in September 1993 based on cost and technical maturity on whether to proceed into phase III, which involves designing, building, and testing the X-30. However, funding constraints and technical concerns have caused DOD and NASA to reconsider the timing of this decision and to restructure the current contract and associated technical efforts. The National Space Council had been responsible for developing overall national policy, direction, and guidance on space activities such as the NASP Program; however, the new administration has designated the Office of Science and Technology Policy to assume these roles. In 1986, the Secretary of Defense and the Administrator of NASA chartered the NASP Steering Group to provide policy, guidance, and broad programmatic direction to the program. Among the Steering Group's tasks were approving both the program's entrance into phase III (subject to the consent of the Secretary of Defense and Administrator of NASA) and substantive changes to the program, resolving programmatic issues, and reviewing proposed changes and making recommendations relative to the program's funding. The Steering Group is currently chaired by the Under Secretary of Defense for Acquisition and the Deputy Administrator of NASA is vice-chair. The Air Force is the program's executive agency and has established a Joint Program Office at Wright-Patterson Air Force Base, Ohio, to manage the program. The NASP National Contractor Team, consisting of five major aerospace contractors is responsible for the majority of the technology development efforts. Since fiscal year 1986, Congress has provided about $1.7 billion to DOD and NASA for phase Il. GAO reported in December 1992 that the projected cost for the baseline program had increased from $3.1 billion to $17.0 billion, the time frames for achieving such milestones as first flight were uncertain, and the development of key technologies had encountered difficulties. These cost, schedule, and technical problems will not be resolved by the completion of the currently planned phase II efforts. Consequently, a decision to begin phase III has been effectively deferred. Neither the Office of Science and Technology Policy, the Steering Group, nor DOD has provided clear direction on what the program's future efforts and objectives should.…
N° de réf. du vendeur 91245
Détails bibliographiques
- Titre
- National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
- Auteur
- United States General Accounting Office
- Éditeur
- United States General Accounting Office, Washington DC
- Année de publication
- 1993
- État de l'article
- Very good
- Reliure
- Wraps
- Édition
- Presumed First Edition, First Printing.
- Catalogues du vendeur
- NASA
Ground Zero Books, Ltd.
Silver Spring, MD, Etats-Unis
Vendeur AbeBooks depuis 14 août 1998
Frais d'expédition à l'intérieur de ce pays : Etats-Unis
| Article | 5 à 20 jours ouvrés | 3 à 6 jours ouvrés |
|---|---|---|
| Premier article | EUR 4,44 | EUR 6,67 |
Modes de paiement
- Chèque
- Facture
- Mandat
- Paypal
Description de la boutique
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Spécialité
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarProfil professionnel du vendeur
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD Etats-Unis 20910-2254
Conditions de vente
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Droit de rétractation
Si vous êtes un consommateur, vous pouvez exercer votre droit de rétractation sur le contrat conformément à ce qui suit. Le mot « consommateur » désigne toute personne physique agissant à des fins qui n'entrent pas dans le cadre de son activité commerciale, artisanale ou professionnelle.
Informations concernant le droit de rétractation
Droit statutaire de rétractation
Vous avez le droit d'exercer votre droit de rétractation sur ce contrat dans les 14 jours sans donner de raison.
Le délai de rétractation expirera au bout de 14 jours à compter du jour où vous-même, ou un tiers autre que le transporteur et désigné par vous, prendrez physiquement possession de la dernière marchandise, du dernier lot ou de la dernière pièce.
Pour exercer votre droit de rétractation, remplissez électroniquement et envoyez une déclaration claire sur notre site Web, sous « Vos achats » dans « Votre compte ». Nous vous communiquerons sans délai un accusé de réception de cette rétractation sur un support durable (par exemple, par e-mail).
Pour respecter le délai de rétractation, il vous suffit d'envoyer votre message concernant l'exercice de votre droit de rétractation avant l'expiration du délai de rétractation.
Effets de la rétractation
Si vous exercez votre droit de rétractation sur ce contrat, nous vous rembourserons tous les paiements que vous avez effectués, y compris les frais de livraison (à l'exception des frais supplémentaires résultant du choix d'un mode de livraison autre que le type de livraison standard le moins cher que nous proposons).
Nous pouvons déduire du remboursement la perte de valeur de toute marchandise livrée, si la perte est le résultat d'une manipulation inutile de votre part.
Nous effectuerons le remboursement dans les meilleurs délais, et au plus tard 14 jours après le jour où nous aurons été informés de votre décision d'exercer votre droit de rétractation sur ce contrat.
Nous effectuerons le remboursement en utilisant le même moyen de paiement que celui que vous avez utilisé pour la transaction initiale, sauf si vous en avez expressément convenu autrement ; en tout état de cause, aucuns frais ne vous seront facturés à la suite d'un tel remboursement.
Nous pouvons suspendre le remboursement jusqu'à ce que nous ayons reçu les marchandises ou que vous ayez fourni la preuve que vous avez renvoyé les marchandises, en fonction de la première éventualité.
Vous devez renvoyer les marchandises ou les remettre à Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, sans retard injustifié et, en tout état de cause, au plus tard 14 jours à compter du jour où vous nous avez communiqué votre décision de rétractation du présent contrat. Le délai est respecté si vous renvoyez les marchandises avant l'expiration du délai de 14 jours. Vous devrez prendre en charge les frais directs du renvoi des marchandises. Vous n'êtes responsable que de toute diminution de valeur des marchandises résultant d'une manipulation autre que celle nécessaire pour établir la nature, les caractéristiques et le fonctionnement des marchandises.
Exceptions au droit de rétractation
Le droit de rétractation ne s'applique pas à ce qui suit :
- Distribution de journaux, de revues ou de magazines, à l'exception des contrats d'abonnement ; et
- Fourniture d'un contenu numérique qui n'est pas fourni sur un support matériel (par exemple, sur un CD ou un DVD) si vous avez accepté, lors de votre commande, que nous puissions commencer à le livrer et que vous ne puissiez pas exercer votre droit de rétractation une fois la livraison commencée.
Conditions d'expédition
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.