ISBN: 9787122148421 - 正版全新 清清楚楚学工程计量与计价丛书:市政工程计量与计价实例解析 (1 résultats)

Affiner la recherche

  • Livres (1)

  • Neuf (1)

à

Fourchette de prix personnalisée (EUR)

à

  • Etat: Neuf

    EUR 78,36

    EUR 16,03 expédition 
    Expédition depuis Chine vers Etats-Unis

    Quantité disponible : 1 disponible

    paperback. Etat : New. Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 2013 Pages: 284 Publisher: Chemical Industry Press clearly learn engineering measurement and valuation Series: and municipal engineering measurement and valuation parsing of six chapters instance. The main content includes an overview. measurement and pricing of generic project. road engineering measurement and valuation. bridge engineering measurement and valuation. drainage engineering measurement and valuation. the use of tea cost of the preparation of the municipal project cost of interest-control software. highlight the list of measurement of the amount of municipal engineering The method of valuation. The book lists the latest calculation instance. road works. bridge works. drainage works cited a complete engineering denominated instance (including construction). to enable the reader to clearly understand the valuation methods and the preparation process. Clearly learn engineering measurement and valuation Series: municipal engineering measurement and valuation instance resolution is particularly applicable to the the municipal project cost management learning to use. and can also be used as teaching reference books for college municipal engineering and engineering management major. Contents: Chapter 1 Overview Section 1 construction project engineering bill pricing norms Quantity of Construction Works list pricing norms (GB50500-2008) prepared in principle. the construction project BOQ pricing norms Section II of the budget of the characteristics of the construction projects BOQ pricing norms fixed metering and pricing (Quantity Unit Price Law). engineering calculation Second. the construction budget preparation) Section III of the preparation of the budget fixed pricing (BOQ measurement and valuation (integrated unit price method). the preparation of BOQ Second. the bill of quantities preparation. BOQ pricing model with fixed budget pricing model differences and connections between municipal engineering construction fee of rates and Engineering measurement and valuation of the second chapter of the Universal project category Section 1 Universal the project engineering metering. earthwork. Pulling Tools pile three. cofferdam construction. support engineering V. Demolition Engineering Sixth. scaffolding and other works. slope protection. retaining wall section II Universal project measurement and valuation of instances (earthwork). fixed budget measurement and valuation (Quantity unit price method. are shown in Table 2-11 to Table 2-16). the measurement and valuation of BOQ (integrated unit price Act. see Table 2-17 to Table 2-24) metering and pricing of road works first road works metering roadbed processing. road base. road surface. the sidewalk side flat stone and other Section II metering and pricing of road works instance Chapter metering and pricing of the first section of Bridges and Culverts Culverts metering piling works. bored pile works 119 three masonry four reinforced engineering five cast-in-place concrete works six. prefabricated concrete works seven. interchange box culvert project eight. installation works and nine temporary works ten. Decoration Engineering Section II Culverts Chapter of the measurement and valuation of instances (bridge) drainage works first drainage works for the measurement and valuation measurement of a pipe-laying wells. drainage. pipeline infrastructure. masonry three slotted pipeline project to drainage structures and five. templates. steel. engineering measurement and valuation of Section 2 Drainage Works instance of tic-tac-toe frame (top tube. Caisson) chapters tea cost meter control software preparation municipal project cost (1) New unit project. open software. a new professional engineering. Select the Template Section II group price. comprehensive list of unit price method input mode. fixed input . fixed translation of four. the input project the amo.…